2681 N. Business Park Avenue, Fresno, CA  93727

Tel: 559.346.0932  |  Fax: 559.346.0959
info@ecifresno.com

© 2019 Excelsior America Group

Made in USA

License # 947083

ISO_9001-2015.jpg

PROJECTS

While these types of projects are our specialty, we certainly have the ability and expertise to adapt to new challenges. Contact us today about your upcoming project.

Columns

ECI removed the existing (105) 3” pipe columns and replaced them with new 6” tube steel columns to make the platform structurally sound.  ECI field verified all dimensions, prefabricated and primed all columns in-house.

Equipment Setting

We set customer supplied equipment, fabricated supply flumes and discharged chutes and connected all utility piping.

Equipment Platform

We fabricated the equipment stand from customer supplied prints.  ECI then shipped and installed the frame and equipment on the platform.

Mud Tank

We fabricated and installed one 10’ wide x 6’ tall x 110’ long mud tank.  This tank was fabricated in shop to help reduce cost.

Solar Panel Archway

ECI field verified and coordinated the mill run production of material to limit material loss.  We subcontracted the rolling of the material, laser cut all base plates and cap plates, fabricated and primed material, and shipped and installed the covered walk way.  Installation was completed in 4 days to meet the customer’s grand opening deadline.

Tank Farm Catwalk

ECI installed existing salvaged catwalks to connect several tank farms.  We fabricated and installed the support structure, sub-contracted concrete demolition, and installed the footings and anchor bolts.  We worked closely with the client to phase the project in the most cost effective manner to keep expenses within their annual budget.

Bleacher Barrier Removal

We completed the shop fabrication, galvanization, and installed the structural supports necessary to bring the football stadium up to ADA compliance. In addition, we installed aluminum planking, chain link fence and hand railing.

PROJECTS

Excelsior Construction is equipped to provide contracting services across a broad spectrum of customer construction project requirements. Listed below is a small sample of projects we have completed.  Contact us today to discuss your construction project needs.

Columns

Removed existing (105) 3” pipe columns and replaced them with new 6” tube steel columns to make the platform structurally sound.  Excelsior Construction field verified all dimensions and prefabricated and primed all columns in-house.

Equipment Setting

Set customer supplied equipment, fabricated supply flumes and discharged chutes and connected all utility piping.

Equipment Platform

Fabricated the equipment stand from customer supplied prints.  Excelsior Construction then shipped and installed the frame and equipment on the platform.

Mud Tank

Custom fabricated and installed one 10’ wide x 6’ tall x 110’ long mud tank.  Fabricated in shop to help reduce cost.

Solar Panel Archway

Field verified and coordinated the mill-run production of material to limit material loss.  Subcontracted the rolling of the material, laser cut all base plates and cap plates, fabricated and primed material, and shipped and installed the covered walk way.  Installation was completed in 4 days to meet the customer’s grand opening deadline.

Tank Farm Catwalk

Installed existing salvaged catwalks to connect several tank farms.  Fabricated and installed the support structure, sub-contracted concrete demolition, and installed the footings and anchor bolts.  Worked closely with the client to phase the project in the most cost effective manner to keep expenses within their annual budget.

Bleacher Barrier Removal

Completed the shop fabrication, galvanization, and installed the structural supports necessary to bring the football stadium up to ADA compliance. In addition, installed aluminum planking, chain link fence and hand railing.

Rack Fabrication

Fabricated, transported and installed large racks produced per customer prints.  The racks were transported from our shop to the site in one piece, saving time and money.